Standards

Where interior requirements come from.

Regulation, statutory guidance, model code, published standard and best-practice review are five different things with five different kinds of authority. Most confusion about interior requirements comes from treating them as one.

On this page

ROMURE does not reproduce code text, and it does not print authority or standards-body logos. Requirements appear as neutral statements with the source, edition and applicability recorded alongside them, exactly as the review framework describes.

Vocabulary

Five kinds of instrument

Knowing which one you are looking at decides who can answer a question about it.

  • Regulation Law made by a legislature or by a government under powers the legislature gave it. Binding where it applies, and enforced by an authority.
  • Statutory guidance Published by government to explain a practical way of meeting a requirement. Often the route everyone uses, and usually not the only route that is legally acceptable.
  • Model code Written centrally, then adopted — or not — by each state, region or city, usually with local amendments. It has no force until a jurisdiction adopts it.
  • Published standard A technical document from a standards body. Frequently referenced by a regulation or a contract, which is what gives it authority on a project.
  • Best-practice review What experienced designers and manufacturers find works in use, and what a review can say about it. It binds nobody, and it is often the difference between a layout that is acceptable and one that is pleasant.
  • Project requirement The client brief, the employer's requirements, a specification clause or a funding condition. Nothing to do with law, and binding all the same.

How to read these pages

What every standards page states

Each page answers the same six questions, in the same order, so two countries can be compared without guessing.

  1. Which instrument it is

    Regulation, statutory guidance, model code, published standard or practice — named as one of the five above.

  2. Whose it is

    The body that publishes it and the authority that administers or enforces it locally.

  3. Who and what it applies to

    Building type, tenure, occupancy and the trigger that brings the requirement into play.

  4. What it does not cover

    The exclusions matter as much as the provisions, especially where a requirement is commonly applied to the wrong kind of building.

  5. What a drawing review can see

    The geometry, dimension and reference evidence that exists on a sheet, and the checks that only make sense on site.

  6. ROMURE's verified coverage

    The honest state of the rule pack for that jurisdiction: currently verified, partial, in validation, or planned.

Coverage

Where coverage stands today

A review only applies a requirement where a verified rule pack exists for the project's location and space type. Where there is none, the review says so instead of guessing.

Coverage at the time of writing, as published in the coverage file
DubaiCurrent verified coverage, partial — a kitchen subset only (spatial planning and accessibility dimensions) of the Dubai Building Code
EnglandCurrent verified coverage, partial — Approved Documents M, K and F for England only, not the United Kingdom
United StatesCurrent verified coverage, partial — the ADA and the Fair Housing Act where each applies. No state or city code has been adopted, so no IBC or IRC conclusion is produced
IndiaCurrent verified coverage, partial — the Harmonised Accessibility Guidelines 2021. State rules vary, so no statewide or nationwide conclusion is produced
Scotland, Wales, Northern IrelandPlanned — no rule registered; each verified against its own sources, separately from England
Every entry above is partial: a pack covers the scopes it was encoded for and nothing else, and no entry is a statement about a whole country or a whole model code. Design, coordination and dimension review runs on the drawing evidence regardless of whether a local rule pack is active. The live coverage statement, generated from the rule registry, is on the review framework page.

Start with one sheet

Send a drawing and see what a review says.

Upload one page. Where a verified requirement pack applies, the finding says so — and where none does, the report says that too.

No payment is taken when you start a review, and no card details are collected on this page.